On May 21, New Times Shipbuilding held a signing and delivery ceremony to formally deliver a 112,500 DWT LNG dual-fuel oil tanker to the Greek shipowner Capital. In attendance were Liu Haijin, General Manager of New Times Shipbuilding; Zhang Yuyong, Executive Deputy General Manager; Yuan Heng, Deputy General Manager; and Nikolaos Vaporis and Andreas Gkatzoflias, representatives of the Greek shipowner Capital.

At the ceremony, Zhang Yuyong, Executive Deputy General Manager of New Times Shipbuilding, and Andreas Gkatzoflias jointly signed the delivery document, marking the vessel’s official handover for operation.

The vessel delivered in this transaction was ordered by the Greek shipowner Capital. It has an overall length of 249.9 meters, a beam of 44 meters, a draft of 21.5 meters, a design draft of 13.6 meters, and a structural draft of 15.2 meters. It has a cargo capacity of 130,500 cubic meters and a deadweight tonnage of 112,500 tons.


