US engineering group KBR has completed the design for the hull and marine systems of a floating production, storage, and offloading (FPSO) unit, delivering a package ready for handover to a shipyard. The FPSO is intended for deployment at the Wisting oil field in the Barents Sea, offshore Norway.
The design of the hull and marine systems was carried out by KBR in collaboration with Norwegian engineering contractor Aibel, which was awarded the front-end engineering design (FEED) contract for the FPSO’s topside modules by Equinor and its partners in October.
KBR’s scope of work encompassed the overall vessel design, structural engineering, marine systems, and hull layout, with a design focus tailored to the harsh marine environment of the Barents Sea.

KBR stated that the design has undergone extensive basin model testing and wind tunnel testing, including validation using a 1:60 scale model of the proposed FPSO. The test results demonstrate that the design can protect the living quarters from “green water” (wave inundation) under extreme conditions—including wave heights approaching 21 meters—thereby supporting subsequent engineering efforts and serving as a basis for construction assessments by the shipyard.
Aibel’s FEED work for the topside modules is expected to continue through the end of 2027, while Kongsberg Maritime will supply the safety and automation systems for the FPSO.
The Wisting oil field is located approximately 310 kilometers north of Hammerfest in a water depth of about 400 meters. With estimated recoverable resources approaching 500 million barrels of oil equivalent, the project will utilize a newly built FPSO. It is operated by Equinor (which holds a 42.5% interest), with other partners including Aker BP (27.5%), Petoro (20%), and Inpex Idemitsu Norge (10%). Equinor and its partners plan to reach a final investment decision (FID) for the project by the end of 2027.


